Hosetower

A Hosetower is the perfect solution for loading or unloading multiple products.

The main advantages hose towers are quicker turnarounds in the port for the ship and the saving of space on the docks. The latest generation of 'Multi Purpose' tankers and new logistic streams with a wide variety of products to be pumped, require a smart way to handle these products in the shortest time possible. Also our Hose towers increase safety, reliability and comfort during loading and unloading of liquid bulk vessels.

JLA Hose towers

JLA has over 25 years of experience in designing and building Hose towers. The main advantages hosetowers are quicker turnarounds in the port for the ship and the saving of space on the docks. The latest generation of 'Multi Purpose' tankers and new logistic streams with a wide variety of products to be pumped, require a smart way to handle these products in the shortest time possible. Also our Hose towers increase safety, reliability and comfort during loading and unloading of liquid bulk vessels.

Characteristics

  • Our hose towers are based on the customer’s operational requirement, we therefore design each specific application in a customer-focused way.
  • Hose towers with up to 100+ loading arms per berth
  • Diameters from 3 to 12"
  • Pressure classes: 150#; 300#; PN16 ; PN25 ; PN40
  • Hydraulic or electric winches

However, scroll of medicinal products is quite large. To buy remedies online from a well-thought-of pharmacy is safe. A lot of people ask abouthow to use viagra. Today, there are many options for people who suffer from erectile malfunction. The most common sexual disorders in men are ED and inhibited sexual wish. Usually, when people talk about generics, they think whats viagra. The most substantial question you need look for is what does viagra look like. Low self-esteem, venous leak, doldrums, and some drugs can reduce your sex drive. Emotional stress may affect natural function, including sexual desire. Prescription remedies can help us, but they can also come with unwanted side effects. It's vital to mind that not all remedies are safe.

Request a quote for the Hosetower

By filling in this quotation form we can serve you fast and accurate, please be aware that the more details you fill in, the better we can serve you with an accurate quotation. You can also send your quotation requests directly to info@jla-loadingarms.com

Company details






Project details





Design data

Arm N°1

Arms used simultaneously

Arm N°2

Arms used simultaneously

Arm N°3

Arms used simultaneously

Arm N°4

Arms used simultaneously

Arm N°5

Arms used simultaneously

Arm N°6

Arms used simultaneously

Dock information

A. Centerline of riser to edge of dock

B. Dock face to compressed fender (mini)

     Dock face to relaxed fender (maxi)

C. Dock level to lowest low water

D. Maximum variation in water level

E. Top of dock to flange centreline For horizontal above dock inlet

F. Optional: top of dock to flange face For vertical below dock inlet

G. Edge of dock to flange face For horizontal above dock inlet only

H / I. Any dock or vessel conditions which might further affect arm design? If so, supply sketch. These dimensions determine the available area between dock and nearest obstacle (valve, structure, manifold, etc.)

H.

I.

J. Base riser spacing on dock Specified by manufacturer, or by customer

Vessel data

K. Minimum setback distance From flange face to vessel side

L. Maximum setback distance From flange face to vessel side

M. Vessel flange to lowest low water Smallest vessel, full

N. Vessel flange to highest high water Largest vessel, empty or ballast

O. Flange spacing on vessel manifold

Minimum

Maximum

P. Rail height

Rail is removable

Q. Distance of vessel flange axis to deck

Minimum

Maximum

Maximum ship movement data

Motions of the vessel relative to the berth or to the FPSO / FSRU in the case of side-by-side operations when applicable

R. During normal loading conditions Inside alarms

Surge

Motion period

    During normal connecting/disconnecting

Surge

Motion period

S. During normal loading conditions Inside alarms

Sway

Motion period

    During normal connecting/disconnecting

Sway

Motion period

T. During normal loading conditions Inside alarms

Heave

Motion period

    During normal connecting/disconnecting

Heave

Motion period

U. Total transverse drift Perpendicular to deck

V. Total longitudinal drift Parallel to deck

    Drift speed in m/s for alarms setting In drift area 0.12 to 0.25m/s

Transverse

Longitudinal

Environment Details

Design wind speed Parked position

Design wind speed During operation

Snow or ice buildup possible

Earthquake possible

Power data

Power supply at site

Cycle

Number of phases

Area classification

Gas group

Temperature classification

Configuration & accessories

Quantity Hosetower

Quantity Loading Arms

Operation

Control panel

Vapor return line

Vapor return line diameter

Diameter

Material

Quick connect/disconnect (QC/DC)

Tracing

Insulation

Manual storm lock

Insulation flange

Earthing lugs

Product

Name

Specific gravity

Viscosity

Allowable pressure drop

Design pressure

Operating pressure

Design Temperature

Operating Temperature

Flow rate

Services

Tests

Surface treatment

Erection

Commissioning

Training

Spares

Send this quotation

Please feel free to use this field to provide us with additional information, also you can upload your drawings and other files that might be of use. When you’ve provided us with all your information press the “send this quotation” button. We do our best to answer your requests within 48 hours.

Optionally upload a sketch